top of page

OUR FEATURED PROJECTS

Project

Experience

Tonic Group takes pride in its portfolio of diverse projects that showcase our expertise and commitment to excellence. From fixed plant drainage to bridge remediation and conveyor sensors, each project has its unique challenges and solutions that define its success. Our portfolio represents our dedication to delivering high-quality construction services that exceed expectations and contribute to the growth of our clients' businesses.

Client : Civmec / Main Roads WA

Brookton Highway Drainage Works

Location:      

 

Brookton WA

 

Duration:

 

6 months

Scope:          

 

General and detailed earthworks, formwork erection, reinforcing/steel fixing, concreteplacement, installation of drainage culverts/pipes and headwalls over 27kms of rural highway.

IMG_9131.heic

Client : Civmec

Albemarle Lithium Plant

Location:      

 

Kemerton SIA (WA)

 

Duration:

 

12 months

Scope:          

 

General and detailed earthworks, formwork erection, reinforcing/steel fixing, and concrete placement. Works conducted site wides across all construction areas.

Kemerton FRP 8.jpg

Client : Mineral Resources

Carina Airport

Location:      

 

Carina Mine Site (Eastern Goldfields)

 

Duration:

 

3 months

Scope:          

 

Rectification of airport drainage and erosion issues along the 1.4km runway footprint. Removal of existing subgrade material, import and placement of engineered fill, reshaping of spillways and swale drains to ensure water shedding from the tarmac area.

FRP Mt Keith 2.jpg

Client : Protective Coating Systems (PCS/CCS)

Albemarle Lithium Plant

Location:      

 

Kemerton SIA (WA)

 

Duration:

 

10 months

Scope:          

 

General and detailed earthworks, formwork erection, reinforcing/steel fixing and concrete placement and general building maintenance works across multiple disciplines.

Kemerton Footing 3.jpg

Client : Albemarle

Albemarle Lithium Plant

Location:      

 

Kemerton SIA (WA)

 

Duration:

 

3 months

Scope:          

 

General and detailed earthworks, formwork erection, reinforcing/steel fixing, and concrete placement. Works conducted site wides across all construction areas.

Kemerton FRP 2.jpg

Client : BHP - Nickel West

Ammonium Nitrate Facility

Location:      

 

Mt Keith Operations

 

Duration:

 

9 months

Scope:          

 

Construction of a AN facility consisting of cement stabilisation of an 18,000m² hardstand area including bulk earthworks and detailed earthworks, formwork erection, reinforcing/steel fixing, concrete placement, and plant & equipment installation.

1504a.jpg
3.png

Client : BHP Whaleback

Primary Crusher Drainage Rectification

Location:      

 

Whaleback (Newman)

 

Duration:

 

2 months

Scope:          

 

Drainage works associated with the undermining of a Primary Crusher conveying system take-up tower. Works included, preparatory excavations and earthworks to excise existing

drainage and water infrastructures, supply, and installation of 450mm HDPE pipe works and valving, excavation and making good of multiple road crossings. Installation of headwalls, diversion drains with stone pitching to aid in water shedding for the crusher area.

3.png

Tonic group engaged to complete cement stabilisation of an 11,000m2 hardstand area for the construction of an Ammonium Nitrate facility in remote western Australia. 

Due to our clients needs for a speedy mobilisation and subsequent execution Tonic and its group partners were able to mobilise this work within a 10 day period to ensure the deadlines for completion were met.  

Tonic group was successfully completed the installation of DN900 waste chutes across our clients screen house infrastructure to remove the risks associated with manual labour and cranage activities to bring waste to ground level for disposal. 

Tonic completed the design and installation of this package to our clients using our in house and group partners ensuring a cost effective outcome. 

image_desktop.png

CONTACT US

Reach out with any
questions or inquiries

Thanks for submitting!

ADDRESS

244 Harris Road

Picton East WA 6229

PHONE

0467 514 544

EMAIL

  • Facebook
  • LinkedIn
  • Twitter

© 2025 Powered and secured by Tonic Group

bottom of page